As a committed regional player, we have comprehensive expertise across the entire value chain of energy projects. Engaged in meaningful projects, we contribute to the modernization of wind farms.


Our model: We develop innovative projects in the modernization of wind farms. Aware of the environmental and societal stakes of this type of energy, we have chosen to develop projects in line with the challenges of local acceptance.
Our specialty is repowering. Active in “repowering” projects, we aim to optimize the potential of already operating sites after a precise evaluation of their potential, conducted by our internal teams.
 
													The Volta Group’s first repowering project was carried out in Brittany, in the commune of Plestan. The Bel Air wind park was dismantled in spring 2022 and the new turbines commissioned in early 2023.
WOJO, 16 rue Washington, 75008 Paris
15 ZA Le Moulin, 04220 Corbières-en-Provence
10 rue Ferdinand de Lesseps, 33693 Mérignac
MDC, 5 rue Pierre Joseph Colin, 35000 Rennes
